Free Project Budget Calculator
Build a simple labor and non-labor project estimate with an explicit contingency allowance.
Updated
What does this calculator do?
Calculate your result
Free · No account requiredYour entries stay in this browser session. Download or copy anything you want to keep.
Formula or structure
Base budget = labor hours × hourly cost + non-labor costs; total = base × (1 + contingency / 100)
Worked example
120 hours × 50 + 1,000 = 7,000 base cost. A 10% allowance adds 700, making 7,700 in the chosen currency.
How to use it
- Read the field descriptions and use one consistent set of units.
- Enter your own figures or select Load example to inspect a worked scenario.
- Review the result alongside the assumptions below.
- Copy or download the output, then assign the next action in your planning workflow.
Assumptions and interpretation
This is a planning estimate. It excludes tax, exchange rates and contract terms, and does not determine an appropriate contingency for your project.
Read the practical guideQuestions about this tool
How does the project budget calculator work?
Do I need an account to use this tool?
Are my inputs uploaded or saved?
Related tools
Sprint Capacity Calculator
Estimate available team hours after leave and focus allocation before committing to sprint work.
ExploreMeeting Cost Calculator
Estimate the staff-time cost of a meeting using attendee count, duration and a loaded hourly cost.
ExplorePERT Estimate Calculator
Combine optimistic, most likely and pessimistic estimates into a weighted planning estimate.
ExploreTurn the plan into shared work
Give each next action an owner, a completion condition and a realistic date. My First Task brings tasks, boards, project workflows and issue tracking into one workspace.