Planning · Free browser tool
Free Meeting Cost Calculator
Estimate the staff-time cost of a meeting using attendee count, duration and a loaded hourly cost.
Updated
What does this calculator do?
Calculate your result
Free · No account requiredYour entries stay in this browser session. Download or copy anything you want to keep.
Formula or structure
Attendees × minutes / 60 × hourly cost; monthly estimate = cost × occurrences
Worked example
Six people meeting for 45 minutes at 40 currency units/hour use 4.5 staff-hours and cost 180 per meeting; four meetings cost 720.
How to use it
- Read the field descriptions and use one consistent set of units.
- Enter your own figures or select Load example to inspect a worked scenario.
- Review the result alongside the assumptions below.
- Copy or download the output, then assign the next action in your planning workflow.
Assumptions and interpretation
This is a labor-cost estimate, not cash saved automatically by cancelling a meeting. Decision quality and preparation also matter.
Read the practical guideQuestions about this tool
Does this include room, travel or software costs?
How does the meeting cost calculator work?
Do I need an account to use this tool?
Are my inputs uploaded or saved?
Related tools
Sprint Capacity Calculator
Estimate available team hours after leave and focus allocation before committing to sprint work.
ExplorePERT Estimate Calculator
Combine optimistic, most likely and pessimistic estimates into a weighted planning estimate.
ExploreSprint Velocity Calculator
Average three completed sprints and estimate how many similar sprints a remaining backlog might need.
ExploreTurn the plan into shared work
Give each next action an owner, a completion condition and a realistic date. My First Task brings tasks, boards, project workflows and issue tracking into one workspace.